Monday, October 29, 2012

Lots of finishes in October, getting ready for November

I have been waiting too long for the blocks to finish my Ireland Quilt so I decided to do my own thing for a few of the blocks.  I will wait a little while longer to see what the last blocks look like and if they don't get posted soon then I will do another one to finish that quilt.

I left my heart in Ireland

Flowers and greenery of Ireland

I like the flying geese block
so I am calling this block
"Flying over the Emerald Isle"

I was able to finish the last 3 of the Morning Glory Designs BOM and now there are 20 completed blocks.

Block 18

Block 19

Block 20

I also took a picture of the first 20 blocks in this BOM.


I also made a Casserole Carrier.  I thought I might make a few for Christmas gifts so I made one for myself to try the pattern out.  I changed the pattern by putting binding around the pieces instead of flipping them inside out and used webbing for the handles instead of fabric.

the outside

the inside

I also made 4 placemats for a friend that I do yoga with twice a week.
I used a pattern from Atkinson Designs book I have.

She wanted burgundy and black so I combined
the burgundy with beige and used black
for the backing and binding.

Peggy.










Monday, October 22, 2012

My Third Teddy Bear Quilt and Halloween Tablerunner

I am all set for the November Guild meeting.  My third teddy bear quilt is finished and I am really happy with it.  I found this pattern in a magazine and just had to try it.


I used the colours in the quilt 
for the binding.

All wrapped up.

This table runner is a McCall's Quilting Web Bonus.  I made it a little wider by not trimming it so close to the center square.    
Monster Munchies

The picture doesn't do justice to the fabrics.  
They are all spider webs and
the yellow has spiders on it.
If you click on the picture
and enlarge it you can
see the spider webs and
the little spiders.
Peggy.


Friday, October 12, 2012

Q, R, S, T.

I haven't posted the alphabet blocks for a while so I thought I would post 4 together.  These have been really fun to do and it keeps me thinking about what Lyn is going to come up with for each letter.

Q is for Quintessential Quilt
 
R is for Radical Revolutionary Rotary Cutter
 
S is for Snappy Scissors
 
T is for Thimble and Thread
 
I have been trying to co-ordinate the letter and what it stands for
when I have been doing these blocks. 
The Letter comes one week and it's mate
the next week.
Peggy

Tuesday, October 9, 2012

October Blocks of the Month

I have been alone since last Thursday October the 4th (YKW and number one son have gone moose hunting) so I have spent my time doing my October BOM's since I also want to get back to finishing up my Christmas gifts.  So after a wonderful Thanksgiving weekend at Hawkeye Lake at the camp of a friend and her family, I was able to finish the last of them.

Craftsy BOM this month was paper piecing and I have been dreading making this block.  Amy Gibson did a wonderful job on her video showing a different way of paper piecing and so much easier than the method that I was taught.  I just love her method.  It went together so fast I will certainly use this method again.


Block 19

Block 20

October Block

October Block

October Block

I still have to finish My Morning Glory Design Block and my Irish Quilt blocks.  The blocks for the Irish Quilt are so slow in coming that I am going to use some of my own ideas to finish it up.

Peggy




Tuesday, October 2, 2012

My September Blocks Are Finished

I finally finished my Craftsy Block of the Month for September.  I had never done a drunkard's path block so it was nice to learn something new.  I made a different block for my first one because instead of cutting the templates I bought Elisa's templates and they were the wrong size.  I learned a lot from using them though.  I also watched her video which was a lot of help using these templates.  I needed the squares to finish at 3 inches and when I used the templates they finished at 3 1/2 inches so in order to make a 12 1/2 inch block I had to put a border around what I made.


September Block Number One

For my second block I made templates so that the block would finish at 12 1/2 inches.

September Block Number Two


Our Guild has a wonderful program every month.  Some very talented people put together a very interesting program at our September guild meeting.  First we had a Phys Ed teacher talk to us about keeping fit and do some exercises when we are quilting.  Many of us tend to hunch ourselves over and tense up when we are quilting and she tried to help us loosen up and relax.

Next the committee showed us some strippers.  They spent the weekend making strip sets of all the colours of the rainbow.  The strip sets were 14 1/2 inches by 68 inches.  They asked us to make a red strip set for this month.  I don't have enough reds to do that, so I recruited a few friends to make 14 1/2 inch squares in red and we will sew them together to make our strip.

My Red 14 1/2 inch square.


Peggy



Wednesday, September 26, 2012

Teddy Bear Quilts

Our guild makes quilts for teddy bears that are given to children at Christmas time.  This year I have started to make mine now so that I am not rushed when November comes.  I have 2 finished.

My first Teddy Bear Quilt.
It is 22 x 28.


Big enough for the child to use
or wrap a doll or teddy bear in.

Number 2 Quilt.

Both quilts are basically the same
but the borders and the backing
are different.

My Sons birthday is in a few weeks, and I saw this panel and couldn't resist buying it for him.

Wild in the Wilderness.
This is a complete panel and
gives you the impression 
that you are looking through
a window at the moose.

Peggy


Wednesday, September 19, 2012

Quilt Therapy now moved to Tuesday

Quilt Therapy Thursday has been moved to Tuesday from now on.  There were a few conflicts on Thursdays so Tuesday seemed to be a better day.

Joyce is cutting some lovely fabric with wine glasses
and grapes that will become
placemats.

Maria is working with blueberries.  
She is also making some placemats.

Pierina has some beautiful mauve's and blues.
She is making a bag to carry her
quilting supplies in.

I am working on my third Teddy Bear quilt.
A small quilt for a child that will have
a Teddy Bear wrapped in it.


Peggy


Monday, September 17, 2012

September Blocks

I am busy doing Christmas projects which I will post after Christmas and I have finished most of my September blocks. 

This door hanging I made is actually
called O Canada but I thought
autumn leaves would look really
nice on it too.

All the Blocks of this quilt can be found here.
The gal that has this blog is a little behind so
I decided to just continue on my own.
She has some nice ideas for blocks
and I want to complete this quilt
with her blocks.

This block of the month uses four colours 
in some of the blocks, but this one
only uses three plus the background.

Apple Avenue September 
and we have 4 apples.


I like this one with the
sunflower and the crow.

Peggy





Thursday, September 6, 2012

A Busy Weekend, lots Accomplished

We were at the cabin on the weekend, so it meant some sewing and some work done.  We got 2 loads of wood so that had to be stacked and also the wood shed had to be tidied up.



YKW did a good job on the wood shed.
 Terry and I helped to stack
the 2 new loads of wood.

The guys went to sight in their guns for hunting season so I did a bit of sewing.  I managed to make 8 placemats and 2 table runners.  Just the tops, not quilted yet.

Trimming 4 patches



I made this one a little while ago and just
finished it up with the patch for
the silverware and napkin.
I plan on using this one for pot luck suppers.

I picked this kit up at a quilt shop
in Beaver Bay, MN.
I finally got 4 of them finished and ready
for fall.

A dressed up Dragonfly.
I didn't like how this one turned out
and Wendy thought that maybe a satin stitch
in a fun colour might help it.
I think it did. Now you can see
the green dragonfly.

Peggy.


Monday, August 27, 2012

Getting Caught Up Continued

Blogger wouldn't let me post any more pictures because I had used up my allotted space and I am not buying space so I spent the last day and 1/2 deleting pictures from 2010.  I figured no one reads that far back anyway.

Some more blocks that were finished this weekend.

I am disappointed with the green dragon fly
it is too pale, but I love my ant.
 
 
 
 



Sunday, August 26, 2012

Getting Caught Up

I was so far behind on my BOM's that I spent the last 2 days doing nothing but blocks.  YKW was up at the cabin and I was alone at home with outside temperatures too hot to enjoy.  So what does one do under these circumstances?   Well you sew, if you are me.  The temperatures the past few days were in the 30C range with humidex around 37C.  Far too hot to be out and about.

Block #15 Yellow Roses
Block #16 Three Tulips in a Vase
 
 
Block #15 Ohio Star
 
Block #16 Double Star
 
August Block
This block took me a long time to do because
of the small pieces all around
the outside edge.
 
The Letter P and Pretty Pinwheels