We were at the cabin the last few days working like crazy because we only had a few days to get the work done. We were replacing some of the pink fiberglass insulation in the ceiling. We had a leaky roof and Terry re-shingled the roof one year on the main cabin and then last year he did the bedroom and porch.
YKW checking over the situation
The insulation is all up, now the fun starts.
The plastic has to be added for a vapour barrier.
Three hours later and a lot of sweat
the plastic is up.
The temperature was around 28C so we
also went through a lot of
bottles of water.